summaryrefslogtreecommitdiff
path: root/test/test_lectionary_ef.ml
diff options
context:
space:
mode:
authorLukasz Kasprzak <lukas@labunix.xyz>2026-08-17 14:26:42 +0200
committerLukasz Kasprzak <lukas@labunix.xyz>2026-08-17 14:26:42 +0200
commit1915f3bb9d74998a411bd55ae658cb3f58fd3477 (patch)
tree072174590e6aef6a684b24960e8894e8bc5865bc /test/test_lectionary_ef.ml
parent3565ebd1608a7d87e0d890f9953845efcfe743ca (diff)
downloadcolitur-1915f3bb9d74998a411bd55ae658cb3f58fd3477.tar.gz
colitur-1915f3bb9d74998a411bd55ae658cb3f58fd3477.zip
docs(ef): fix round 2 -- three miscitations and a recorded blind spot
Comment and citation corrections found by review, plus one finding that survived an attempt to reconstruct it. No behaviour change; the suite is unchanged at 358 green. The ferial rubric "Diebus ferialibus a 2 ad 5 ianuarii Missa dicitur ut die 1 ianuarii" was attributed to RG 17(a) in three test comments. It is not RG 17(a). RG 17(a) (LT.txt:843) fixes only WHEN the Holy Name is kept -- "celebrandum dominica quae occurrit a die 2 ad 5 ianuarii; secus die 2 ianuarii". The rubric quoted is a Mass-propers rubric printed under the Sanctissimi Nominis Iesu heading (scan1:6523-6526, corroborated scan2:7216), governing what the ordinary ferias of that window say when they are not the feast at all. Two rules sharing a date window. Fix round 1 had already corrected this on the data side; the generator's own comment was right throughout. Only the test comments were stale. test_differential.ml named bootstrap_lectionary.ml's derived_entries as the source of ef-holy-name's citations. That binding no longer exists -- it was the mechanism that derived them from ef-holy-name-sunday's wrongly-widened ini translation, removed in Task 9 because the derivation was itself the error. They are hand-authored from the scans now, as holy_name_entries. M26's shape 1 described its 21 rows as votive Masses of the BVM "on an otherwise-unoccupied feria, not only a Saturday", splitting them into 4 BVM-Saturday rows and 17 "ordinary weekday ferias". Every one of the 21 is a Saturday, each checked individually against date -d. The error was not merely verbal: it made the gap look broader than a single cause and pointed away from the one rule that explains all 21. The sub-groups differ by season, not weekday, and only in what colitur shows in the votive Mass's place. One gap -- the office is built (RG 91 entry 27), the seasonal selection among the five Masses is not. Recorded, not fixed: step 4 of the reading chain has no oracle witness at all. This began as a note to write up a live-oracle confirmation for Felicitas and Perpetua; the reconstruction contradicted its premise. The sweep ran over 2028, where 6 March resolves as a Lenten feria with the saint admitted only as a commemoration, so her own Mass is never read that year. The finding underneath is firmer: only five saints route through a Common, they are the observed office on five days in all of 2005-2050 (isidore-of-seville 2008/2035/2046, frances-rome and sts-felicitas-perpetua both 2038), two are never observed in 46 years, and none falls in layer 4's window. Layer 3 does not cover it either -- lectio resolves the literal "-"/"-" sentinel there, which is what C18 is gated on, so it confirms only that colitur emits a citation where lectio emits none, never that it is right. Closing it needs the oracle fixture extended to 2035, 2038 or 2046; that is a fixture-scope decision. Register: sections 6.6 and 6.7. CLAUDE.md's layer-blindness list gains the step-4 entry.
Diffstat (limited to 'test/test_lectionary_ef.ml')
-rw-r--r--test/test_lectionary_ef.ml6
1 files changed, 4 insertions, 2 deletions
diff --git a/test/test_lectionary_ef.ml b/test/test_lectionary_ef.ml
index 39e3cb8..3ed6987 100644
--- a/test/test_lectionary_ef.ml
+++ b/test/test_lectionary_ef.ml
@@ -159,8 +159,10 @@ let test_step3_advent_feria_resumes_sunday () =
REPLACED AGAIN, Task 9 (branch ef-lectionary, layer-4 oracle): 2028-01-05
("ef-christmas-1-wednesday") stopped exercising step 3 too, the SAME
- fate as the 2025-12-29 case this comment already documents -- RG 17(a)'s
- own "diebus ferialibus a 2 ad 5 ianuarii" rubric now gives it a direct
+ fate as the 2025-12-29 case this comment already documents -- the
+ Missal's own Mass-propers "diebus ferialibus a 2 ad 5 ianuarii" rubric
+ (CORRECTED, fix round 2: attributed to RG 17(a) here, which it is not --
+ RG 17(a) fixes only WHEN the Holy Name is kept) now gives it a direct
entry (tools/bootstrap_lectionary.ml's own
[epiphanytide_opening_entries]), so it resolves at step 2. The three
families this task's own fix closed (2-5 January, 7-12 January, Holy