summaryrefslogtreecommitdiff
path: root/data/ef/expected-divergences-missalemeum.sexp
diff options
context:
space:
mode:
Diffstat (limited to 'data/ef/expected-divergences-missalemeum.sexp')
-rw-r--r--data/ef/expected-divergences-missalemeum.sexp6
1 files changed, 3 insertions, 3 deletions
diff --git a/data/ef/expected-divergences-missalemeum.sexp b/data/ef/expected-divergences-missalemeum.sexp
index effb7c9..2a21b25 100644
--- a/data/ef/expected-divergences-missalemeum.sexp
+++ b/data/ef/expected-divergences-missalemeum.sexp
@@ -237,9 +237,9 @@ WIDENED, Task 9 (branch ef-lectionary, layer-4 oracle): [First_mismatch]/[Gospel
(note "`barbara` (4 December, data/ef/adjustments.sexp's own new `Add`, ef-sanctoral-audit task) is a genuine DATA GAP in missalemeum too: both years' own 4 December row shows only the Advent feria's own temporal commemoration, Barbara absent entirely, not even listed as displaced -- missalemeum never constructed a candidate for her either, the identical absence lectio's own tridentine-calendar.ini has. Identity-gated the same way [M19] is (coordinator finding F2, that entry's own note): the predicate requires colitur's own admitted set to be exactly the temporal feria plus `barbara`, not merely that some [Comm_count] diff exists on this date. Derived directly from the OCaml comparator's own failure output: 2 (both years in the window).")
(expected_rows 2))
((id M16)
- (citation "1962 calendarium's March table (same primary text as M13's own citation): \"Feria VI post dominicam I Passionis: Commemoratio septem Dolorum B. Mariae Virg.\" -- a fixed commemoration of Our Lady's Seven Sorrows for the Friday of Passion Week, every year, confirmed real")
- (verdict missalemeum)
- (note "27 March 2026 (Friday of Passion Week): colitur admits \"St. John Damascene\" (a real Class3 universal feast that genuinely falls that day, data/ef/sanctoral.sexp's own john-damascene entry, 27 March); missalemeum shows \"For Our Lady of the Seven Sorrows\" instead. The SAME standing gap M13 already names: the Seven-Sorrows-of-Passion-Friday commemoration is confirmed real in the primary text but not implemented anywhere in temporal_ef.ml, so colitur has no candidate for it and falls back to whichever ordinary Class3 saint actually wins that Friday. Verdict missalemeum: colitur is missing a real, primary-cited office, not differently opinioned. Register ยง6 open item (the same one M13's own note already tracks). Only 2026 shows here as an IDENTITY mismatch -- 2027's Friday of Passion Week IS 19 March, M13's own date, where identity comparison cannot even be reached (M13's own rank/colour mismatch already excludes that day from count-matched identity comparison, folded into M13's own widened subset above). NOTE for whoever builds the office (fix round 1, coordinator finding 7): 27 March 2026 is a III-class day, where RG 111(d) admits TWO commemorations -- yet missalemeum admits only the Seven Sorrows and DISPLACES John Damascene entirely, not merely drops him to second place. A naive implementation (one more ordinary III-class commemoration competing for the day's two slots) would give colitur two commemorations where missalemeum shows one; whatever privilege the Seven Sorrows carries must itself explain the exclusion, not just win admission.")
+ (citation "RG 111(d) (LT.txt:1777-1778): \"in diebus liturgicis III et IV classis, duae tantum admittuntur commemorationes\" -- TWO commemorations are admitted on a III-class day. RG 113 (LT.txt:1800-1802): \"Commemoratio de Tempore fit primo loco. In admittendis et ordinandis aliis commemorationibus, servetur ordo tabellae praecedentiae.\" RG 114: only a commemoration EXCEEDING the day's number is omitted. Calendarium, LT.txt:5056: \"Feria VI post dominicam I Passionis: Commemoratio septem Dolorum B. Mariae Virg.\"")
+ (verdict colitur)
+ (note "RE-ADJUDICATED 2026-08-17, and the verdict is REVERSED. This entry previously read verdict missalemeum: colitur admitted St John Damascene where missalemeum showed the Seven Sorrows, because the Seven Sorrows commemoration of Passion Friday was a known unimplemented office -- colitur had no candidate to admit at all. It could not be built before Date_spec grew Easter_offset, the Friday after Passion Sunday being Easter-9 and so having no (month, day) pair to anchor to. It is built now. Both streams name the Seven Sorrows, and the old identity mismatch is gone. What remains is a COUNT difference running the OTHER way: 27 March 2026 is a III-class privileged Passiontide feria, RG 111(d) admits TWO commemorations there, and colitur admits exactly two -- the Seven Sorrows (de Tempore, first, per RG 113) and John Damascene, a real III-class universal feast genuinely falling that day. missalemeum admits only one and reports John Damascene as displaced entirely, dropping a commemoration the rubric allows. Read on the primary text colitur is right. Recorded honestly: this is the fourth divergence in this file adjudicated colitur where missalemeum drops or mis-assigns something (cf. Monica, Perpetua's Common, Christ the King's week), which is a pattern worth watching rather than four coincidences. 1 row: 2026-03-27 only. The 2027 instance is M13's own, a DIFFERENT dispute about whether St Joseph is displaced from Passion Friday at all, unchanged by this work.")
(expected_rows 1))
((id M18)
(citation "test_oracle.ml's own header, \"COMMEMORATION IDENTITY\" section, restated for the OBSERVED axis (ef-rg112-rg110 task) -- not an RG citation, a comparator LIMIT: Rite_ef.Temporal_ef never sets an English [names] field on any candidate it builds, the SAME limit M15 already names for a commemoration, now visible for the OBSERVED day itself now that the observed-identity axis exists")