aboutsummaryrefslogtreecommitdiff
path: root/lib/kernel/slug.ml
Commit message (Collapse)AuthorAgeFilesLines
* kernel+rite-ef: correct stale plan-relative deferrals (item 7, part 2)Lukasz Kasprzak2026-08-121-2/+6
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Several comments described work as "arriving with Plan 3" or "waiting for Plan 3" that either shipped without it or refer to the wrong future plan number, all now false in ways that would mislead the next reader: - temporal_ef.ml (two places) and precedence_ef.ml said the Major Litanies (25 April, RG 80) "arrive with Plan 3's sanctoral". Plan 3 shipped, in this branch, without them; register §6 tracks this as a plain open item with no plan committed to build it, and now says so. - temporal_ef.ml said the Sacred Triduum's "own named offices are a Plan 3 sanctoral addition". Wrong on two counts: Plan 3 shipped without adding them, AND a proper office for I-class FERIAS was never a sanctoral matter in the first place (RG 21 defines "feria" to exclude Sundays/feasts, not the reverse). 2026-04-02/03/04 still resolve to the ordinary Passiontide ferial fallback's own generic slugs (ef-passiontide-2-{thursday,friday,saturday}), confirmed against real output; register §6 now records this as its own open item. - temporal_ef.ml said the Rogation-Wednesday commemoration (Ascension Vigil day, entry 21) "waits for RG 108-111" -- both the precedence framework and RG 108-111 exist now; the Wednesday's own commemoration is still never constructed, but for a different, still-real reason (no candidate is wired for it), not a forward dependency. Fixed at both of this comment's two occurrences in the file. - vocab.ml/vocab.mli's `seasons` field doc said "Validate's contiguity check reads this" -- false since validate.ml's "seasons" check switched to Rite.t.season_runs in this branch (rite-supplied, to support a season appearing in more than one run, which the modern form's Ordinary Time needs and EF does not). - vocab.ml/vocab.mli's `ranks` field doc said "it is not a precedence relation until Plan 3 defines one" -- Plan 3 did define one (RG 111's dignity ordering), but as its own small, separately-hardcoded function in precedence_ef.ml, not one derived from this field; corrected to say so precisely rather than leaving a forward-looking claim unresolved. - The lectionary bootstrap (reading citations, Liturgical_day.t's own `citations` field) is called "Plan 3" at slug.ml, vocab_ef.ml, and three places in temporal_ef.ml, but "Plan 4" at liturgical_day.mli (whose own doc comment -- "always empty until Plan 4" -- is the authoritative one: the SANCTORAL bootstrap is Plan 3 and shipped; the LECTIONARY bootstrap is a separate, later Plan 4). All six corrected to say Plan 4, cross-referencing the Plan 3/4 distinction at the first (slug.ml) occurrence so the reasoning is not duplicated six times. No behaviour change: every edit here is a comment/documentation correction. Verified byte-identical `colitur day` output across 1583, 1900, 1902, 2008, 2011, 2026, 2038, 9999. 259/259 tests green.
* kernel: Slug and Lang validated private stringsLukasz Kasprzak2026-08-111-0/+29
Both parse through a smart constructor returning result, and both hand-write t_of_sexp so a malformed value in a data file is rejected at load rather than silently accepted -- deriving the converter would have bypassed validation.