aboutsummaryrefslogtreecommitdiff
path: root/lib/rites
diff options
context:
space:
mode:
Diffstat (limited to 'lib/rites')
-rw-r--r--lib/rites/rite_ef/temporal_ef.ml22
1 files changed, 19 insertions, 3 deletions
diff --git a/lib/rites/rite_ef/temporal_ef.ml b/lib/rites/rite_ef/temporal_ef.ml
index 4eac99f..4147278 100644
--- a/lib/rites/rite_ef/temporal_ef.ml
+++ b/lib/rites/rite_ef/temporal_ef.ml
@@ -95,15 +95,31 @@ let named d =
Some (Paschaltide, "ef-ascension-vigil", Colour.White, Class2, None)
else if same d (off 39) then Some (Paschaltide, "ef-ascension", Colour.White, Class1, None)
else if same d (off 48) then
- Some (Paschaltide, "ef-pentecost-vigil", Colour.Red, Class1, None) (* RG 91 entry 9 *)
- else if same d (off 49) then Some (Paschaltide, "ef-pentecost", Colour.Red, Class1, None)
+ (* Carries week 7 -- the same week as the Friday before it -- for
+ consistency with the other named Sundays here (Easter, Low Sunday,
+ Trinity below): a named day inside a season run must not interrupt the
+ run's week continuity. Not an RG rule, an internal-consistency one;
+ this was [None] until the Validate invariant harness (Task 14) caught
+ the resulting jump on the following Monday. *)
+ Some (Paschaltide, "ef-pentecost-vigil", Colour.Red, Class1, Some 7) (* RG 91 entry 9 *)
+ else if same d (off 49) then
+ (* Carries week 8, for the same reason as the Vigil just above. *)
+ Some (Paschaltide, "ef-pentecost", Colour.Red, Class1, Some 8)
else if same d (off 56) then Some (Time_after_pentecost, "ef-trinity", Colour.White, Class1, Some 1)
else if same d (off 60) then
Some (Time_after_pentecost, "ef-corpus-christi", Colour.White, Class1, None)
else if same d (off 68) then
Some (Time_after_pentecost, "ef-sacred-heart", Colour.White, Class1, None)
else if same d (christ_the_king y) then
- Some (Time_after_pentecost, "ef-christ-the-king", Colour.White, Class1, None)
+ (* Carries its computed week number too, for the same internal-consistency
+ reason as Pentecost above -- caught by the same Validate finding.
+ Unlike Pentecost this isn't a fixed Easter-offset, so it can't be a
+ literal; [week] below computes it but is defined later in this file and
+ can't be called from here, so the same expression is inlined here.
+ test_named_week_agrees_with_week pins the two together. *)
+ let pentecost = off 49 in
+ Some (Time_after_pentecost, "ef-christ-the-king", Colour.White, Class1,
+ Some ((Date.to_rata d - Date.to_rata pentecost) / 7))
else None
let days_between a b = Date.to_rata b - Date.to_rata a