aboutsummaryrefslogtreecommitdiff
path: root/test/golden/ordo-2027.tex
diff options
context:
space:
mode:
Diffstat (limited to 'test/golden/ordo-2027.tex')
-rw-r--r--test/golden/ordo-2027.tex276
1 files changed, 142 insertions, 134 deletions
diff --git a/test/golden/ordo-2027.tex b/test/golden/ordo-2027.tex
index e432f8c..336ddc1 100644
--- a/test/golden/ordo-2027.tex
+++ b/test/golden/ordo-2027.tex
@@ -7,11 +7,13 @@
% the top third of every page and cost 65 pages for a year that needed far
% fewer; that requirement is reversed here on purpose, not merely relaxed).
% Structure stays scannable through two header weights instead: every
-% week still opens with its existing small header line ( .
-% Week N), and the month's own FIRST week additionally gets a
-% large, ruled banner above that line (, a real
-% view field -- lib/render/view.ml -- not template-side arithmetic, since
-% this engine has no way to test "is this the first item" any other way).
+% week still opens with its own header line -- a Roman week number plus
+% the span of in-month dates it covers, e.g. Hebdomada I (Ian 1-2), with
+% no month name repeated, since the month heading above already
+% establishes it -- and the month's own FIRST week additionally gets a
+% large, ruled banner above that line (view field [first], lib/render/
+% view.ml -- not template-side arithmetic, since this engine has no way
+% to test "is this the first item" any other way).
% \needspace (a genuine, tiny dependency, not one of the deps this project
% freezes at the OCaml level -- LaTeX packages are a template author's own
% concern) keeps a header from being stranded alone at a page's bottom
@@ -68,9 +70,15 @@
% The engine has no parent-path syntax: nested inside a month's own week
% loop, a bare week-number reference finds the WEEK's own number, and there
% is no way to reach the enclosing month's from there. That is why each
-% week object carries its own month number and month name fields
-% (lib/render/view.ml, Task 5) -- used throughout below instead of a
-% parent-path reference, which this engine cannot express.
+% week object carries its own month number, month name and abbreviated
+% month name fields (lib/render/view.ml) -- used throughout below instead
+% of a parent-path reference, which this engine cannot express. The same
+% view resolves the week's own Roman numeral too (num_roman, arabic num
+% kept alongside it for a tradition that wants it), the day-of-month of
+% its first and last in-month day (first_dom/last_dom), and single_day
+% (true for a one-day week) -- a punctuation choice (Ian 1 vs Ian 1-2)
+% this logic-less engine cannot make for itself, so the template below
+% picks the dash only inside an inverted single_day section.
%
% This template's own %-comments are plain text to the engine: it has no
% awareness of LaTeX's comment syntax, and a stray double-brace pair inside
@@ -127,102 +135,102 @@
\begin{small}
\textbf{ January }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w1-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w1-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w1-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w1-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w1-5}\par
-\hspace*{4mm}Week 6\dotfill\pageref{w1-6}\par
+\hspace*{4mm}Week I (Jan 1--2)\dotfill\pageref{w1-1}\par
+\hspace*{4mm}Week II (Jan 3--9)\dotfill\pageref{w1-2}\par
+\hspace*{4mm}Week III (Jan 10--16)\dotfill\pageref{w1-3}\par
+\hspace*{4mm}Week IV (Jan 17--23)\dotfill\pageref{w1-4}\par
+\hspace*{4mm}Week V (Jan 24--30)\dotfill\pageref{w1-5}\par
+\hspace*{4mm}Week VI (Jan 31)\dotfill\pageref{w1-6}\par
\textbf{ February }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w2-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w2-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w2-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w2-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w2-5}\par
+\hspace*{4mm}Week I (Feb 1--6)\dotfill\pageref{w2-1}\par
+\hspace*{4mm}Week II (Feb 7--13)\dotfill\pageref{w2-2}\par
+\hspace*{4mm}Week III (Feb 14--20)\dotfill\pageref{w2-3}\par
+\hspace*{4mm}Week IV (Feb 21--27)\dotfill\pageref{w2-4}\par
+\hspace*{4mm}Week V (Feb 28)\dotfill\pageref{w2-5}\par
\textbf{ March }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w3-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w3-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w3-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w3-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w3-5}\par
+\hspace*{4mm}Week I (Mar 1--6)\dotfill\pageref{w3-1}\par
+\hspace*{4mm}Week II (Mar 7--13)\dotfill\pageref{w3-2}\par
+\hspace*{4mm}Week III (Mar 14--20)\dotfill\pageref{w3-3}\par
+\hspace*{4mm}Week IV (Mar 21--27)\dotfill\pageref{w3-4}\par
+\hspace*{4mm}Week V (Mar 28--31)\dotfill\pageref{w3-5}\par
\textbf{ April }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w4-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w4-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w4-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w4-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w4-5}\par
+\hspace*{4mm}Week I (Apr 1--3)\dotfill\pageref{w4-1}\par
+\hspace*{4mm}Week II (Apr 4--10)\dotfill\pageref{w4-2}\par
+\hspace*{4mm}Week III (Apr 11--17)\dotfill\pageref{w4-3}\par
+\hspace*{4mm}Week IV (Apr 18--24)\dotfill\pageref{w4-4}\par
+\hspace*{4mm}Week V (Apr 25--30)\dotfill\pageref{w4-5}\par
\textbf{ May }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w5-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w5-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w5-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w5-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w5-5}\par
-\hspace*{4mm}Week 6\dotfill\pageref{w5-6}\par
+\hspace*{4mm}Week I (May 1)\dotfill\pageref{w5-1}\par
+\hspace*{4mm}Week II (May 2--8)\dotfill\pageref{w5-2}\par
+\hspace*{4mm}Week III (May 9--15)\dotfill\pageref{w5-3}\par
+\hspace*{4mm}Week IV (May 16--22)\dotfill\pageref{w5-4}\par
+\hspace*{4mm}Week V (May 23--29)\dotfill\pageref{w5-5}\par
+\hspace*{4mm}Week VI (May 30--31)\dotfill\pageref{w5-6}\par
\textbf{ June }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w6-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w6-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w6-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w6-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w6-5}\par
+\hspace*{4mm}Week I (Jun 1--5)\dotfill\pageref{w6-1}\par
+\hspace*{4mm}Week II (Jun 6--12)\dotfill\pageref{w6-2}\par
+\hspace*{4mm}Week III (Jun 13--19)\dotfill\pageref{w6-3}\par
+\hspace*{4mm}Week IV (Jun 20--26)\dotfill\pageref{w6-4}\par
+\hspace*{4mm}Week V (Jun 27--30)\dotfill\pageref{w6-5}\par
\textbf{ July }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w7-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w7-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w7-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w7-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w7-5}\par
+\hspace*{4mm}Week I (Jul 1--3)\dotfill\pageref{w7-1}\par
+\hspace*{4mm}Week II (Jul 4--10)\dotfill\pageref{w7-2}\par
+\hspace*{4mm}Week III (Jul 11--17)\dotfill\pageref{w7-3}\par
+\hspace*{4mm}Week IV (Jul 18--24)\dotfill\pageref{w7-4}\par
+\hspace*{4mm}Week V (Jul 25--31)\dotfill\pageref{w7-5}\par
\textbf{ August }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w8-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w8-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w8-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w8-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w8-5}\par
+\hspace*{4mm}Week I (Aug 1--7)\dotfill\pageref{w8-1}\par
+\hspace*{4mm}Week II (Aug 8--14)\dotfill\pageref{w8-2}\par
+\hspace*{4mm}Week III (Aug 15--21)\dotfill\pageref{w8-3}\par
+\hspace*{4mm}Week IV (Aug 22--28)\dotfill\pageref{w8-4}\par
+\hspace*{4mm}Week V (Aug 29--31)\dotfill\pageref{w8-5}\par
\textbf{ September }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w9-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w9-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w9-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w9-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w9-5}\par
+\hspace*{4mm}Week I (Sep 1--4)\dotfill\pageref{w9-1}\par
+\hspace*{4mm}Week II (Sep 5--11)\dotfill\pageref{w9-2}\par
+\hspace*{4mm}Week III (Sep 12--18)\dotfill\pageref{w9-3}\par
+\hspace*{4mm}Week IV (Sep 19--25)\dotfill\pageref{w9-4}\par
+\hspace*{4mm}Week V (Sep 26--30)\dotfill\pageref{w9-5}\par
\textbf{ October }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w10-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w10-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w10-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w10-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w10-5}\par
-\hspace*{4mm}Week 6\dotfill\pageref{w10-6}\par
+\hspace*{4mm}Week I (Oct 1--2)\dotfill\pageref{w10-1}\par
+\hspace*{4mm}Week II (Oct 3--9)\dotfill\pageref{w10-2}\par
+\hspace*{4mm}Week III (Oct 10--16)\dotfill\pageref{w10-3}\par
+\hspace*{4mm}Week IV (Oct 17--23)\dotfill\pageref{w10-4}\par
+\hspace*{4mm}Week V (Oct 24--30)\dotfill\pageref{w10-5}\par
+\hspace*{4mm}Week VI (Oct 31)\dotfill\pageref{w10-6}\par
\textbf{ November }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w11-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w11-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w11-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w11-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w11-5}\par
+\hspace*{4mm}Week I (Nov 1--6)\dotfill\pageref{w11-1}\par
+\hspace*{4mm}Week II (Nov 7--13)\dotfill\pageref{w11-2}\par
+\hspace*{4mm}Week III (Nov 14--20)\dotfill\pageref{w11-3}\par
+\hspace*{4mm}Week IV (Nov 21--27)\dotfill\pageref{w11-4}\par
+\hspace*{4mm}Week V (Nov 28--30)\dotfill\pageref{w11-5}\par
\textbf{ December }\par
-\hspace*{4mm}Week 1\dotfill\pageref{w12-1}\par
-\hspace*{4mm}Week 2\dotfill\pageref{w12-2}\par
-\hspace*{4mm}Week 3\dotfill\pageref{w12-3}\par
-\hspace*{4mm}Week 4\dotfill\pageref{w12-4}\par
-\hspace*{4mm}Week 5\dotfill\pageref{w12-5}\par
+\hspace*{4mm}Week I (Dec 1--4)\dotfill\pageref{w12-1}\par
+\hspace*{4mm}Week II (Dec 5--11)\dotfill\pageref{w12-2}\par
+\hspace*{4mm}Week III (Dec 12--18)\dotfill\pageref{w12-3}\par
+\hspace*{4mm}Week IV (Dec 19--25)\dotfill\pageref{w12-4}\par
+\hspace*{4mm}Week V (Dec 26--31)\dotfill\pageref{w12-5}\par
\end{small}
@@ -237,7 +245,7 @@
\needspace{16mm}
\label{w1-1}
-{\bfseries\large January }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Jan 1--2)}\par\vspace{0.5mm}
@@ -272,7 +280,7 @@
\needspace{16mm}
\label{w1-2}
-{\bfseries\large January }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Jan 3--9)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -342,7 +350,7 @@
\needspace{16mm}
\label{w1-3}
-{\bfseries\large January }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Jan 10--16)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -412,7 +420,7 @@
\needspace{16mm}
\label{w1-4}
-{\bfseries\large January }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Jan 17--23)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -482,7 +490,7 @@
\needspace{16mm}
\label{w1-5}
-{\bfseries\large January }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Jan 24--30)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -552,7 +560,7 @@
\needspace{16mm}
\label{w1-6}
-{\bfseries\large January }\hfill{\small Week 6}\par\vspace{0.5mm}
+{\bfseries\large Week VI }{\small (Jan 31)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -586,7 +594,7 @@
\needspace{16mm}
\label{w2-1}
-{\bfseries\large February }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Feb 1--6)}\par\vspace{0.5mm}
@@ -649,7 +657,7 @@
\needspace{16mm}
\label{w2-2}
-{\bfseries\large February }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Feb 7--13)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -719,7 +727,7 @@
\needspace{16mm}
\label{w2-3}
-{\bfseries\large February }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Feb 14--20)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -789,7 +797,7 @@
\needspace{16mm}
\label{w2-4}
-{\bfseries\large February }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Feb 21--27)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -859,7 +867,7 @@
\needspace{16mm}
\label{w2-5}
-{\bfseries\large February }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Feb 28)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -893,7 +901,7 @@
\needspace{16mm}
\label{w3-1}
-{\bfseries\large March }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Mar 1--6)}\par\vspace{0.5mm}
@@ -956,7 +964,7 @@
\needspace{16mm}
\label{w3-2}
-{\bfseries\large March }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Mar 7--13)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1026,7 +1034,7 @@
\needspace{16mm}
\label{w3-3}
-{\bfseries\large March }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Mar 14--20)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1096,7 +1104,7 @@
\needspace{16mm}
\label{w3-4}
-{\bfseries\large March }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Mar 21--27)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1166,7 +1174,7 @@
\needspace{16mm}
\label{w3-5}
-{\bfseries\large March }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Mar 28--31)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1221,7 +1229,7 @@
\needspace{16mm}
\label{w4-1}
-{\bfseries\large April }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Apr 1--3)}\par\vspace{0.5mm}
@@ -1263,7 +1271,7 @@
\needspace{16mm}
\label{w4-2}
-{\bfseries\large April }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Apr 4--10)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1333,7 +1341,7 @@
\needspace{16mm}
\label{w4-3}
-{\bfseries\large April }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Apr 11--17)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1403,7 +1411,7 @@
\needspace{16mm}
\label{w4-4}
-{\bfseries\large April }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Apr 18--24)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1473,7 +1481,7 @@
\needspace{16mm}
\label{w4-5}
-{\bfseries\large April }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Apr 25--30)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1542,7 +1550,7 @@
\needspace{16mm}
\label{w5-1}
-{\bfseries\large May }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (May 1)}\par\vspace{0.5mm}
@@ -1570,7 +1578,7 @@
\needspace{16mm}
\label{w5-2}
-{\bfseries\large May }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (May 2--8)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1640,7 +1648,7 @@
\needspace{16mm}
\label{w5-3}
-{\bfseries\large May }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (May 9--15)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1710,7 +1718,7 @@
\needspace{16mm}
\label{w5-4}
-{\bfseries\large May }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (May 16--22)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1780,7 +1788,7 @@
\needspace{16mm}
\label{w5-5}
-{\bfseries\large May }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (May 23--29)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1850,7 +1858,7 @@
\needspace{16mm}
\label{w5-6}
-{\bfseries\large May }\hfill{\small Week 6}\par\vspace{0.5mm}
+{\bfseries\large Week VI }{\small (May 30--31)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -1891,7 +1899,7 @@
\needspace{16mm}
\label{w6-1}
-{\bfseries\large June }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Jun 1--5)}\par\vspace{0.5mm}
@@ -1947,7 +1955,7 @@
\needspace{16mm}
\label{w6-2}
-{\bfseries\large June }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Jun 6--12)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2017,7 +2025,7 @@
\needspace{16mm}
\label{w6-3}
-{\bfseries\large June }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Jun 13--19)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2087,7 +2095,7 @@
\needspace{16mm}
\label{w6-4}
-{\bfseries\large June }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Jun 20--26)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2157,7 +2165,7 @@
\needspace{16mm}
\label{w6-5}
-{\bfseries\large June }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Jun 27--30)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2212,7 +2220,7 @@
\needspace{16mm}
\label{w7-1}
-{\bfseries\large July }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Jul 1--3)}\par\vspace{0.5mm}
@@ -2254,7 +2262,7 @@
\needspace{16mm}
\label{w7-2}
-{\bfseries\large July }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Jul 4--10)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2324,7 +2332,7 @@
\needspace{16mm}
\label{w7-3}
-{\bfseries\large July }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Jul 11--17)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2394,7 +2402,7 @@
\needspace{16mm}
\label{w7-4}
-{\bfseries\large July }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Jul 18--24)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2464,7 +2472,7 @@
\needspace{16mm}
\label{w7-5}
-{\bfseries\large July }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Jul 25--31)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2540,7 +2548,7 @@
\needspace{16mm}
\label{w8-1}
-{\bfseries\large August }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Aug 1--7)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2610,7 +2618,7 @@
\needspace{16mm}
\label{w8-2}
-{\bfseries\large August }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Aug 8--14)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2680,7 +2688,7 @@
\needspace{16mm}
\label{w8-3}
-{\bfseries\large August }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Aug 15--21)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2750,7 +2758,7 @@
\needspace{16mm}
\label{w8-4}
-{\bfseries\large August }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Aug 22--28)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2820,7 +2828,7 @@
\needspace{16mm}
\label{w8-5}
-{\bfseries\large August }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Aug 29--31)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2868,7 +2876,7 @@
\needspace{16mm}
\label{w9-1}
-{\bfseries\large September }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Sep 1--4)}\par\vspace{0.5mm}
@@ -2917,7 +2925,7 @@
\needspace{16mm}
\label{w9-2}
-{\bfseries\large September }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Sep 5--11)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -2987,7 +2995,7 @@
\needspace{16mm}
\label{w9-3}
-{\bfseries\large September }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Sep 12--18)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3057,7 +3065,7 @@
\needspace{16mm}
\label{w9-4}
-{\bfseries\large September }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Sep 19--25)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3127,7 +3135,7 @@
\needspace{16mm}
\label{w9-5}
-{\bfseries\large September }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Sep 26--30)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3189,7 +3197,7 @@
\needspace{16mm}
\label{w10-1}
-{\bfseries\large October }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Oct 1--2)}\par\vspace{0.5mm}
@@ -3224,7 +3232,7 @@
\needspace{16mm}
\label{w10-2}
-{\bfseries\large October }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Oct 3--9)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3294,7 +3302,7 @@
\needspace{16mm}
\label{w10-3}
-{\bfseries\large October }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Oct 10--16)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3364,7 +3372,7 @@
\needspace{16mm}
\label{w10-4}
-{\bfseries\large October }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Oct 17--23)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3434,7 +3442,7 @@
\needspace{16mm}
\label{w10-5}
-{\bfseries\large October }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Oct 24--30)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3504,7 +3512,7 @@
\needspace{16mm}
\label{w10-6}
-{\bfseries\large October }\hfill{\small Week 6}\par\vspace{0.5mm}
+{\bfseries\large Week VI }{\small (Oct 31)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3538,7 +3546,7 @@
\needspace{16mm}
\label{w11-1}
-{\bfseries\large November }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Nov 1--6)}\par\vspace{0.5mm}
@@ -3601,7 +3609,7 @@
\needspace{16mm}
\label{w11-2}
-{\bfseries\large November }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Nov 7--13)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3671,7 +3679,7 @@
\needspace{16mm}
\label{w11-3}
-{\bfseries\large November }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Nov 14--20)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3741,7 +3749,7 @@
\needspace{16mm}
\label{w11-4}
-{\bfseries\large November }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Nov 21--27)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3811,7 +3819,7 @@
\needspace{16mm}
\label{w11-5}
-{\bfseries\large November }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Nov 28--30)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3859,7 +3867,7 @@
\needspace{16mm}
\label{w12-1}
-{\bfseries\large December }\hfill{\small Week 1}\par\vspace{0.5mm}
+{\bfseries\large Week I }{\small (Dec 1--4)}\par\vspace{0.5mm}
@@ -3908,7 +3916,7 @@
\needspace{16mm}
\label{w12-2}
-{\bfseries\large December }\hfill{\small Week 2}\par\vspace{0.5mm}
+{\bfseries\large Week II }{\small (Dec 5--11)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -3978,7 +3986,7 @@
\needspace{16mm}
\label{w12-3}
-{\bfseries\large December }\hfill{\small Week 3}\par\vspace{0.5mm}
+{\bfseries\large Week III }{\small (Dec 12--18)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -4048,7 +4056,7 @@
\needspace{16mm}
\label{w12-4}
-{\bfseries\large December }\hfill{\small Week 4}\par\vspace{0.5mm}
+{\bfseries\large Week IV }{\small (Dec 19--25)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]
@@ -4118,7 +4126,7 @@
\needspace{16mm}
\label{w12-5}
-{\bfseries\large December }\hfill{\small Week 5}\par\vspace{0.5mm}
+{\bfseries\large Week V }{\small (Dec 26--31)}\par\vspace{0.5mm}
\begin{tcolorbox}[colback=white,colframe=black!35,boxrule=0.3pt,left=1.4mm,right=1.4mm,top=0.2mm,bottom=0.2mm,before skip=0.2mm,after skip=0mm]